Parameter and Command Reference > Digital Safe Connector Configuration Parameters > Connector Parameters > EnableScheduledTasks

EnableScheduledTasks
Specify whether configured tasks in the main connector configuration are enabled. If this parameter is enabled, a synchronize action is sent according to the configured schedule. If this parameter is disabled, all actions must be generated externally.